Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Genset Model | 120GT-CT |
Rated Power | 120KW / 150KVA |
Rated Speed/ Rated Frequency | 1500 rpm /50Hz |
Rated Voltage | 400/230v |
Power Factor | 0.8 |
Phase/Wire | 3Phase/4Wire |
Rated current(A) | 216 |
Gas Type | natural gas |
Overall Size (mm) | 2400*1100*1600 |
Weight (kg) | 1950 |
Air intake way | Turbo intercooled |
Cooling way | Closed cooling cycle |
Cylinder | 6 |
Displacement(L) | 8.3 |
BorexStroke (mm) | 114*135 |
Max.standby power @50Hz | 132kw / 165kva |
Rated Power | 128kw / 160kva |
Excitation way | Brushless and self exciting |
Voltage control | AVR |
Insulation class | H |
Protection | IP23 |
Remarks: 1. Fuel requirements :methane content≥92% ( or Gas low heat value ≥ 33 MJ/Nm3 ), sulfur content≤200PPM, impurities size≤5μm, impurities content≤50mg/Nm³, water content≤40 g/Nm3 ; 2. Manufacturing standards:ISO8528-5,GB/T2820.5-2009,GB/T22343-2008; 3. Every gas genset have been pass the test under the load of 0%,25%,50%,75%,100% and the response ability of static, dynamic test, all the protection device and control system are pass strict inspection before they leave factory. |
Q: What's your warranty period?
A: Since genset reached the agreed destination, its main parts will be guaranteed within 12months or 1000hours(subject to the earlier mature term).
Q: What's your delivery time?
A: Normally delivery time is 30 days, and if your order is urgent, we can communicate then speed it up.
Q: Do you accept OEM service?
A: Yes, we accept OEM.
Q.What is the difference between Prime power and Standby power?
A.:Prime power is 12hours continous power,one hour 10% over load in every 12 running hours is allowed.
Standby power is the limit value of maximum output for emergency use. Overloading is prohibited.